Chief of mine, Chief of open pit, of main engineer, chief specialist (expert)

  • Занятость:
    Полная занятость
  • График работы:
    Полный день

Опыт работы

Февраль 2016 —
март 2016
1 месяц
Petropavlovsk
Chief Engineer
Mining and processing of gold-bearing ores. 5 million tons / year. 36 million m3 of rock mass.
Июнь 2010 —
июнь 2015
5 лет
Rusal Achinsk
Chief of Kiya-Shaltirskiy nepheline mine
Performance of the mine 5 million tons of ore. 7 million cubic meters of rock mass
Working as chief of subdivision I am providing organization of extraction of nepheline ore in necessary quality and quantity, its crushing, loading in railroad cars and sending off to Аchinskiy aluminous industrial complex. I am keeping up the life support of mining-getters’ settlement with the help of the work of boiler-house and GPP, I am providing support of highways of general-purpose, I am working out prospective and yearly plans of the fulfillment of production programs, I am coordinating the work of my subdivision and adjacent structures, I am governing the workshop’s stuff (reached productivity of the open pit is 10 million ms a year according to mining mass). The number of the stuff is 460 people (before restructuring)
Февраль 2009 —
май 2010
1 год 3 месяца
ZAO "Kolmarproekt"
Chief of Zirynski col mine
By extraction and sale of coal. 250 thousand tons per year, the staff of 300 people to organize safe and efficient production, control over the execution of any laws. Profiting society. Starting the enterprise stopped. Crisis management. Awarded the title of
Сентябрь 2008 —
февраль 2009
5 месяцев
ZAO "Kolmarproekt"
Chief of Sahaolovo
1500 tons of concentrate up to 1000 people. In operation, the head ensures stable operation of the mine, the motor transportation enterprise in the Far North. The underground mining method, obogoschenie getting olovokontsentrata and its implementation. Provide units with the necessary material and human resources. The search for sources of financing, the establishment of an effective motivational tool for staff work. Crisis management.
Март 2008 —
июль 2008
4 месяца
OOO "Lobskoe-5"
Chief of open pit Lobskoe-5
I was providing safe and effective conditions of production by extraction of granite and production of crushed stone. I was coordinating all stages of work in company, making budget plans and controlling their realization. I was controlling the compliance of legislation of RF. I was taking part in investing of company. I have worked with the staff (selection, training, attitude development). During my work the arrangements for loading to freight ships were built and the dead-end track was put into operation.
Февраль 2005 —
март 2008
3 года 1 месяц
Rusal Achinsk
Chief of Kiya-Shaltirskiy nepheline mine Rusal Achinsk
Working as chief of subdivision I am providing organization of extraction of nepheline ore in necessary quality and quantity, its crushing, loading in railroad cars and sending off to Alchinskiy aluminous industrial complex. I am keeping up the life support of mining-getters’ settlement with the help of the work of boiler-house and GPP, I am providing support of highways of general-purpose, I am working out prospective and yearly plans of the fulfillment of production programs, I am coordinating the work of my subdivision and adjacent structures, I am governing the workshop’s stuff (reached productivity of the open pit is 10 million ms a year according to mining mass). The number of the stuff is 760 people (before restructuring)

During my work as a chief of the workshop the following was provided:
- rise of using coefficient of the main equipments due to timely and qualitative repairs and time-lowering of unregulated stoppages up 69% to 85%;
- costs for extraction of ore are reduced in 5 % compare with the last year;
- working capital for the repair works and technical services of the basic subdivision’s reserves is reduced in 3 % compare with the last year;
- the planned investment actions and the program of costs lowering in 100 % are fulfilled.

The program of quality stabilization of nepheline ore is realized.

8 proposals in system of costs lowering and increasing the efficiency of production were worked out by me; one of them is “Organization of filling of the 7th dump”.
The economic result of the using of the proposal was 750 thousand $.

I was reward with the diploma of “Ministry of Industry” for success in work in 2002 and I was given a medal for great services in Kuzbas in 2008.
Август 1985 —
декабрь 2004
19 лет 4 месяца
Объединённая компания РУСАЛ
Mine foreman, head of drilling and blasting operations, the chief engineer
Ore mining

Обо мне

Личные качества:
Работоспособность, ответственность, целеустремленность, стрессоустойчивость, доброжелательность.
Увлечения: атлетическая гимнастика.

Образование высшее

Знание языков

Русский — родной
Иностранные языки
АнглийскийA1 — Начальный

Гражданство, время в пути до работы

  • Гражданство:
    Нет
  • Разрешение на работу:
    Нет
  • Желательное время в пути до работы:
    Не имеет значения